ASME NON-NUCLEAR CERTIFICATION

ASME NON-NUCLEAR CERTIFICATION

Do you need an ASME certificate for the production of boilers (section I - Power Boiler), pressure equipment (section VIII division 1 and division 2 - Pressure Vessel) or piping (B31.1 - Power Piping)? We will arrange a contract with an accredited ASME agency Hartford Steam Boiler Inspection and Insurance Company of Connecticut and you have taken the first step into the world of ASME BPV regulations!

Do you want to be success in the global market and your customers request ASME Certification? Following steps are necessary and for the success certification:

  • Have you used ASME Consultation of our company? If so, we will help you to sign the contract with HSB. This contract is necessary for the ensuring of authorized ASME inspections. Result is certification of pressure parts.
    (From 3 to 12 months before Joint Review)

  • A conclusion of the contract with accredited inspection agency. We recommend HSB Global Standards, which provides the contact with very qualified authorized inspectors. No monthly fees after the conclusion of contract. There are fees connected only to the performance of Inspector connected to the orders and audits.
    (From 3 to 6 month before Joint Review)

  • ON-LINE registration at the ASME organization on the website: http://caconnect.asme.org (there has to be mentioned the range of certification, contact person, contract with Inspection agency, certification place and date)
    (From 2 to 4 montrhs before Joint Review) 

  • Purchase of the ASME Codes according to the range of certification.
    (From 2 to 6 months before Joint Review)

  • Payment of deposit to ASME organization and acceptance of date of the Joint Review.
    (At least 2 months before Joint Review) 

  • Realization of Pre Joint Review performed by Auditors from the Inspection Agency (which you have signed  the contract).
    (from 3 to 4 months before Joint Review)

  • ASME Joint Review performed by 3 auditors: The first one is representative of ASME organization, and 2 auditors are representatives of Inspection Agency HSB Global Standards.

  • Issue of Certificate by ASME Committee on recommendation of Team Leader.

 

What are the indicative certification costs?

We have an experiences and we actively participate in several ASME non-nuclear and nuclear audits throughout the year. We reflect the latest knowledges from the ASME Team Leaders and implement them into your company's systemt.

Don't know what ASME certification involves, how much cost preparation and audit and how long do you need to prepare? Use our ASME CONSULTATION services, more in the section "Inspection and audit activities".

ASME NUCLEAR CERTIFICATION

ASME NUCLEAR CERTIFICATION

Do you supply of pressure parts for nuclear energy? Do you need to obtain an ASME certificate for the production of pressure parts according to ASME Sec. III? We will provide a contract with the accredited ASME agency Hartford Steam Boiler Inspection and Insurance Company of Connecticut and you have taken the first step into the world of nuclear power according to ASME Sec. III

Do you have a customer who is certified by ASME Sec. III.? Do you have external audits to gain the status of a qualified supplier of nuclear pressure components? It will be easier for you to certify according to ASME Sec. III. You also succee in world markets and you can offer to your customers their own ASME "N" certificate. Pay attention to the following information that will help you get closer to the certification process:

  • Have you used ASME Consultation of our company? If so, we will help you to sign the contract with HSB. This contract is necessary for the ensuring of authorized ASME inspections. Result is certification of pressure parts.
    (From 6 to 12 months before Joint Review)

  • A conclusion of the contract with accredited inspection agency. We recommend HSB Global Standards, which provides the contact with very qualified authorized inspectors. No monthly fees after the conclusion of contract. There are fees connected only to the performance of Inspector connected to the orders and audits.(From 6 to 12 month before Joint Review)

  • Purchase of the ASME Codes according to the range of certification.
    (From 2 to 6 months before Joint Review)

  • Real preparation of demonstration part for audit survey - implementation, indoctrination, Quality Assurance Program, design, calculations, personnel qualification, purchase of materials and services, non-destructive and destructive testing, welding process qualification, supplier approval and audits, corrective action, document control, inspection , pressure testing, calibration, certification, etc.
    (4 - 9 months)

  • ON-LINE registration at the ASME organization on the website: http://caconnect.asme.org (there has to be mentioned the range of certification, contact person, contract with Inspection agency, certification place and date)
    (From 4 to 6 montrhs before Joint Review)

  • Payment to the ASME organization according to the current conditions public on the websites of ASME organization: http://www.asme.org/shop/certification-and-accreditation/to-start-a-certificate-application
    (From 4 to 5 months before Joint Review)

  • Payment of deposit to ASME organization and acceptance of date of the Joint Review.
    (At least from 2 to 3 months before Joint Review)

  • Realization of Pre Joint Review performed by Auditors from the Inspection Agency (which you have signed  the contract).
    (from 3 to 4 weeks before Joint Review)

  • ASME Survey Audit performed by 3 auditors: The first one is representative of ASME organization, and 2 auditors are representatives of Inspection Agency HSB Global Standards.
    (agreed date with ASME organization)

  • Issue of Certificate by ASME Committee on recommendation of Team Leader. 
    (within 2 months after successful audit)

What are the indicative certification costs?

  • purchase of ASME codes http://www.ihs.com
  • production costs of the demonstration part
  • costs associated with ASME fees, more at http://www.asme.org
  • costs associated with consulting and preparing for the ASME Survey audit


Composition of the survey audit team and duration:

  • The five-member audit team consists of three ASME auditors and two representatives from the inspection agency (ANI, ANIS)
  • Audit duration is min. 3 days to a maximum of 5 days.


Who is N, NPT or NS certification for?

  • manufacturer of pressure equipment - reactors, steam generators, primary and secondary circuit piping
  • manufacturers of valves, safety valves and pumps
  • manufacturers of pressure equipment for nuclear waste
  • manufacturers of metallurgical products

We have an experiences and we actively participate in several ASME non-nuclear and nuclear audits throughout the year. We reflect the latest knowledges from the ASME Team Leaders and implement them into your company's systemt.

Don't know what ASME certification involves, how much does the preparation and audit cost and how long do you need to prepare? 


Contact us at info@heinrich-in.cz.



ASME MATERIAL ORGANIZATION  CERTIFICATION

ASME MATERIAL ORGANIZATION CERTIFICATION

Do you want to supply material for the nuclear power industry according to ASME Sec. III / NCA-3800? Do you want to prevent external customer audits and increase your company's prestige? The certificate issued by the ASME organization based on the survey audit will include you in the worldwide database of suppliers / manufacturers for this demanding segment of nuclear energy.

Obtain the ASME MO Certificate is based on the "Quality System Program", which is performed only by ASME organizations by their authorized auditors. This certificate is issued for a period of 3 years and the ASME organization assesses the "Quality Manual" and its implementation during the audit survey. Manufacturers who are certified according to ASME Sec. III / NCA-3800 "Material Organization" (MO) may not have a contractual relationship with an accredited inspection agency, but it is common for organizations to consult the inspection agency. The reason is clear, accredited inspection agency according to ASME Sec. III performs comprehensive services for organizations with N, NPT or NS stamp, where the certification process is considerably more extensive and demanding.

What responsibilities must the MO organization fulfill:

  • the material organization must establish, document, implement and maintain the "Quality System Program" as required by NCA-3850;
  • the MO must determine rules for marking of the material and traceability, which must keep under control,
  • quality assurance during production including inspection, testing, repair and other material processing,
  • evaluation, qualification and auditing of suppliers if they do not hold the MO certificate,
  • approval and control of operations performed by your suppliers,
  • preparation of the Certified Material attest CMTR,
  • delivery of the material.

The following points must be ensured in terms of pre-joint review survey preparations:

  • Quality System Manual according to NCA-3853,
  • preparation of demonstration parts or real order,
  • registration at the ASME organization via CA Connect,
  • make a deposit and request a Survey Audit term,
  • control of the demonstration part including documentation before the joint review,
  • joint review,
  • issue of the MO certificate according to the recommendations of the ASME Nuclear audit team.

Composition of the survey audit team and duration:

  • audit team is composed of min. two ASME representatives,
  • audit duration is min. 3 days to a maximum of 5 days.

Who is MO Certification suitable for?

  • manufacturer of metallurgical materials
  • manufacturers of welding consumables,
  • pressure parts manufacturers according to ASME Sec. III.


Are you interested in cooperation? Contact us at info@heinrich-in.cz

API CERTIFICATION

API CERTIFICATION

Do you need to get API Monogram or certify your Quality Management System according to API Spec Q1? Do your clients require API Certification or do you want to increase your competitiveness in the global market? We are able to ensure training of the employees and prepare Quality system to successful completion of API Audit. Be part of the global market and join to more than 4 600 certified companies in more than 80 countries.

What does the API mean? American Petroleum Institute is the largest U.S. trade association for the oil and natural gas industry. It claims to represent about 600 corporations involved production and distribution in petroleum industry. The Certification is very valuable marketing tool for gain of new customers and strong quality indicator for potential customers. API Monogram is voluntary licensing program designed to facilitate the consistent manufacturing of product that conforms to API standards. 


Following steps are necessary:

  • Buying API Standards. You should buy at least API Spec Q1 (Quality System Requirements) and Product Specification (for example API Spec 5CT – Casing and Tubing)
  • System Implementation–Quality management system requirements. Management responsibility, Organization Capability, Documentation requirements, Control of records.
    (Duration: 1 – 2 months)
  • System Implementation – Product realization. Planning, Risk Assessment and Management, Purchasing, Product and servicing provision, control of Nonconforming product, etc.
    (Duration: 3 – 5 months)
  • System Implementation – QMS Monitoring, Measurement, Analysis and Improvement. Analysis of Data, Improvement, Management review.
    (Duration: 3 – 5 months)
  • Registration with the API Organization. Your company has to register and pay Non-Refundable fees to API Organization. This step can be realized during the Implementation of system - depends on readiness of company.(From 3 to 6 months before Audit)
  • Internal API pre-Audit. Detailed system review regarding to following API Audit.(From 1 to 2 months before audit)
  • API Audit performed by API Auditor in your company.Renewal audit is after each 3 year period.

Our company is able to go through all steps mentioned above with you and prepare to the API Audit. We are able to help you meet welding requirements (qualification of Procedures and Welders) and NDT requirements (Qualification of NDT personnel according to SNT-TC-1A).

What are the costs of certification?

-          Send us inquiry toinfo@heinrich-in.cz

-          Or call +420 777 323 593

22/5000 ISO 3834 - CERTIFICATION

22/5000 ISO 3834 - CERTIFICATION

Do you need to implement an ISO 3834 welding system? Our company provides the preparation and implementation of this system and in cooperation with accredited organizations we will ensure favorable conditions in terms of quality, time and price!

What is necessary to obtain ISO-3834 certificate?

  1. We'll do a "Root gap analysis" in your company to find out how well your company is ready to implement ISO 3834,
  2. Based on your customers' requirements and your company's preparation we will propose a degree of certification,
  3. Based on the Root gap analysis, we will prepare a quotation and suggest the most suitable certification organization,
  4. Implementation of the system according to the results of "Root gap analysis". If your company has experience with this system, it is likely that you can proceed directly to the pre-joint review. The condition is an established quality manual according to ISO 3834,
  5. Pre-joint review with a certification organization and a representative of our company, where we guarantee a successful result from the pre-audit,ISO 3834 audit from our participation,
  6. Issue of the certificate by the certification organization.

If you are interested in these services, please contact us at info@heinrich-in.cz